Galvanized Steel Flange Head Self drilling Screws
中部

PRODUCT

HOME / PRODUCT / Screw / Self-drilling Screws / Galvanized Steel Flange Head Self drilling Screws
Product
Galvanized Steel Flange Head Self drilling Screws

Material:steel

Finish: Galvanized

Certification: ISO7380

MOQ:1000PCS

Samples: Free

Place of Origin: Zhejiang China

* Name
Mobile
* Email

Product Details

Galvanized steel flange head self-drilling screws 

Description:

 

 

Name Galvanized steel flange head self-drilling screws
Place of Origin Jiaxing, Zhejiang, China
Dimension st2.9-6.3
Surfance zinc plated
Material carbon steel
Standard DIN
Non-standards OEM is available, according to drawing or samples
Samples Samples are free.
Package Pack the box first and put it in the carton, or according to customers' requirement.
Payment  T/T or L/C
产品缩略图lw.jpg

tz.jpg

螺纹规格 ST2.9 ST3.5 (ST3.9) ST4.2 ST4.8 (ST5.5) ST6.3
P 螺距   1.1 1.3 1.3 1.4 1.6 1.8 1.8
a 最大值   1.1 1.3 1.3 1.4 1.6 1.8 1.8
c 最小值   0.4 0.6 0.6 0.8 0.9 1 1
dc 最大值   6.3 8.3 8.3 8.8 10.5 11 13.5
最小值   5.8 7.6 7.6 8.1 9.8 10 12.2
e 最小值   4.28 5.96 5.96 7.59 8.71 8.71 10.95
k 最大值   2.8 3.4 3.4 4.1 4.3 5.4 5.9
最小值   2.5 3 3 3.6 3.8 4.8 5.3
kw 最小值   1.3 1.5 1.5 1.8 2.2 2.7 3.1
r 最大值   0.4 0.5 0.5 0.6 0.7 0.8 0.9
s 最大值   4 5.5 5.5 7 8 8 10
最小值   3.82 5.32 5.32 6.78 7.78 7.78 9.78
dp 2.3 2.8 3.1 3.6 4.1 4.8 5.8
钻削范围(板厚) 0.7~1.9 0.7~2.25 0.7~2.4 1.75~3 1.75~4.4 1.75~5.25 2~6

 

Packaging & Shipping

Standard export packing or According to customer's requirement

Our Services
1.We,ll always be online whenever you look for us.
2..The customer is god, and we always focus on the customer's point of view
3.We produce your order strictly by your request. If the quality was not acceptable, we will refund to you.
FAQ

 

Q:What is your main products?

A:Fasteners, Bolt, nut, screws, washer, threaded rod, anchors, self tapping screws, self driling screws, stainless steel plate, etc.

Q: What is your delivery time?

A:It depends on if we have stock or not, if we have stock goods, we can delivery within 2 days after receive the payment. And normally our production is in 20-30 days for one container (20-26 ton) products.