VIDEO & CENTER
On December 29, local time, the Oman Manah II photovoltaic power generation project contracted by China Energy Construction Shanxi Institute passed the 120-hour uninterrupted operation performance test, and the performance indicators were better than the requirements of the EPC contract, achieving the initial commercial operation (ICOD) goal. The project is located in the Manah Regional Photovoltaic Industrial Park in Oman, with a total installed capacity of 588.2 MW.