PRODUCT
On the ground rail, the rail can be welded on the foundation or fixed with screws, then push the rail nut into the rail, turn it 90 degrees, insert the lower half of the pipe clamp into the nut, put the pipe to be fixed, and then put The upper and upper half of the pipe clamp body and cover plate are fixed with screws.
Product Details