PRODUCT
Material: Steel
Finish: Galvanized
Certification: ISO7380
Standard:DIN975
MOQ:1000PCS
Samples: Free
Place of Origin: Zhejiang China
Product Details
Din975 steel galvanized threaded rod
Description:
Name | din975 steel galvanized threaded rod |
Place of Origin | Jiaxing, Zhejiang, China |
Dimension | m2-m72 |
Surfance | zinc plated |
Material | carbon steel |
Standard | din975 |
Non-standards | OEM is available, according to drawing or samples |
Samples | Samples are free. |
Package | Pack the box first and put it in the carton, or according to customers' requirement. |
Payment | T/T or L/C |
螺纹尺寸 | M2 | M2.5 | M3 | (M3.5) | M4 | M5 | M6 | M8 | M10 | M12 | (M14) | M16 | (M18) | ||
d | |||||||||||||||
P | 粗牙 | 0.4 | 0.45 | 0.5 | 0.6 | 0.7 | 0.8 | 1 | 1.25 | 1.5 | 1.75 | 2 | 2 | 2.5 | |
细牙 | / | / | / | / | / | / | / | 1 | 1.25 | 1.25 | 1.5 | 1.5 | 1.5 | ||
细牙 | / | / | / | / | / | / | / | / | 1 | 1.5 | / | / | / | ||
L | ±10 | 1000 | 1000 | 1000 | 1000 | 1000 | 1000 | 1000 | 1000 | 1000 | 1000 | 1000 | 1000 | 1000 | |
千件重(钢制)≈kg | 18.7 | 30 | 44 | 60 | 78 | 124 | 177 | 319 | 500 | 725 | 970 | 1330 | 1650 | ||
螺纹尺寸 | M20 | (M22) | M24 | (M27) | M30 | (M33) | M36 | (M39) | M42 | (M45) | M48 | (M52) | |||
d | |||||||||||||||
P | 粗牙 | 2.5 | 2.5 | 3 | 3 | 3.5 | 3.5 | 4 | 4 | 4.5 | 4.5 | 5 | 5 | ||
细牙 | 1.5 | 1.5 | 2 | 2 | 2 | 2 | 3 | 3 | 3 | 3 | 3 | 3 | |||
细牙 | / | / | / | / | / | / | / | / | / | / | / | / | |||
L | ±10 | 1000 | 1000 | 1000 | 1000 | 1000 | 1000 | 1000 | 1000 | 1000 | 1000 | 1000 | 1000 | ||
千件重(钢制)≈kg | 2080 | 2540 | 3000 | 3850 | 4750 | 5900 | 6900 | 8200 | 9400 | 11000 | 12400 | 14700 |
Standard export packing or According to customer's requirement
Q:What is your main products?
A:Fasteners, Bolt, nut, screws, washer, threaded rod, anchors, self tapping screws, self driling screws, stainless steel plate, etc.
Q: What is your delivery time?
A:It depends on if we have stock or not, if we have stock goods, we can delivery within 2 days after receive the payment. And normally our production is in 20-30 days for one container (20-26 ton) products.